Compliance Company Logo

You are currently viewing the C-PRAV Global website. Change Location Below: 

Choose site location: 

Requirements and Exemptions for “PON Family of Broadband Equipment”

Share This Post

TEC has announced the new requirements for some parameters under “PON Family of Broadband Equipment” .

Please refer to the table below for detailed overview:

ER Parameter Standard Name as per ER   Remarks 
Protocol Test for any PON Interface As per Standard Mentioned in the ER Exempted till 30.06.2024 (vide letter No. 5-5/2021-TC/TEC dated 08.01.2024) 
Automatic Laser Shut-Down (ALS) or Automatic Power Shut-Down (APSD) ITU-T G.664. IEC 60825. Annex-A1 Self-Declaration of Conformity by Applicant/ OEM is Acceptable 
ECR TEC 74046 Annex-R Applicant may upload test reports/results indicating ECR values calculated/tested as per TEC standard with testing done in- house by OEM or through any NABL accredited lab 
Interoperability Test for GPON Int ITU-T G.984.x G.988 and BFF-TR-255 Annex-J5 Applicant may upload test reports/results for all sub-parameters of GPON G.988 and interoperability test as per Annexure- BFF-TR-255 J5/Appendix-III of ‘Annexure to ER’ with testing done in any NABL accredited lab or Annex-J5 Page 1 of 2 OEM’s in-house lab. (Kindly refer for method of Interoperability testing as mentioned in the ‘Note’ under Annexure-J5 of ‘Annexure to ER’ along with undertaking for inter-operability to be submitted)  

Subscribe To Our Newsletter

Get updates and learn from the best

More To Explore

Need Assistance? Contact Us Today!

Get in touch with us today to ensure your products meet both global & local standards.